Wow that took me a loooong time, but it’s now “completed” well I still need to do some electric work so I can hide those wires, and also connect the fan to cool down the little NUC inside the base.

Let see the picture now shall we…

Electric cables will be in the floor.
View when sitting
Frank NX01 Build

Leave a Reply

Your email address will not be published. Required fields are marked *